Book it once the contractor says the fit-out is complete, but before you sign off or release final payment – that’s your leverage to get snags fixed at their cost.
Identify fit-out defects early and ensure a high-quality finish with our professional Residential Interior Fit-Out Inspection.
1. What is a handover inspection in Dubai and the UAE?
A handover inspection is a detailed property assessment conducted before you take possession of a newly built home. It identifies construction defects, finishing issues, and MEP faults so the developer can rectify them before ownership is officially transferred.
2. When should I book a handover inspection?
You should schedule a handover inspection as soon as you receive the developer’s handover notification and before signing the acceptance form. This helps ensure that any defects are documented and corrected at the developer’s expense.
3. What does a handover inspection include?
A handover inspection covers walls, ceilings, flooring, doors, windows, plumbing systems, electrical installations, HVAC performance, and checks for moisture, leaks, and other construction defects. All findings are documented with photographs and detailed reports.
4. Why is a professional handover inspection important?
A professional inspection helps uncover hidden defects that may not be visible during a standard walkthrough. Identifying these issues before accepting the property can save homeowners significant repair costs and ensure the property meets expected quality standards.